Floor Plans

Floor plan 2 - 7

FLOOR

SQ FT

SQ M

 

Floors 9 - 15

5,543

515

up arrow

Floor 8

5,540

514

up arrow

Floors 1 - 7

17,868

1,659.5

up arrow

Ground Floor

-

-

up arrow

Basement

-

-

up arrow
view out of the window of the EXO building

Sample Fitout

Fitout floor 1 - 7

Sample Fitouts

Density (per. person)

Workstations

 

Floors 9 - 15

10.72 sq.m

48

up arrow

Floors 1 - 7

9.12 sq.m

182

up arrow

Accommodation Schedule

FLOORS

SQ M

SQ FT

Reception Core 1 (North)

163.58

1,761

Reception Core 3 (South)

147.16

1,584

1

1,647.52

17,734

2

1,654.40

17,808

3

1,657.30

17,839

4

1,658.55

17,852

5

1,659.49

17,863

6

1,659.49

17,863

7

1,659.49

17,863

8

514.69

5,540

9

514.69

5,540

10

515.35

5,547

11

515.35

5,547

12

515.35

5,547

13

515.35

5,547

14

515.35

5,547

15

512.15

5,513

TOTAL NET LETTABLE AREA 16,025.23 172,494
ROOF TERRACE LEVEL 08 1,048 11,281

Specification

Image of a bathroom EXO Building Elevators

Summary

Sustainability

  • LEED Core and Shell Gold
  • Building Energy rating BER A3
  • Secure basement bicycle parking and shower facilities
  • Energy efficient lighting with occupancy control
  • Detailed energy modelling validating energy in-use and savings
  • Energy efficient infrastructure to serve tenant space
  • Water saving appliances

Transportation Services

Passenger Lifts

  • 2 no 13 person lifts Core1 Levels 0 – 7
  • 3 no 13 person lifts Core1 Levels 0 – 15
  • 3 no 13 person passenger lifts Core 3

Goods Lift

  • 1 no standard goods lift Core 2

Fire Fighting Lifts

  • Provision: Core 1 and 3 firefighting shafts

Mechanical & Public Health Services Installation

  • Centralised fresh air plant located at basement and roof level providing fresh and tempered air to 4-pipe fan coils (heating and cooling) on each open plan floor.
  • Fresh air provided at a rate of 12.0 (dm³/s) per person based on an occupancy density of 1 person per 8.0 (m2).
  • Centralised mechanical extract to sanitary accommodation with make-up air form adjoining office floor plate.
  • Dedicated supply and extract ventilation plant to basement showering facilities.
  • Main entrance lobbies mechanically cooled (fan coils) and heated (underfloor heating).
  • Sprinkler protection throughout with internal rising and falling firefighting mains (wet).
  • Smoke clearance systems to firefighting shafts, basement plant areas and car parking.
  EXO Building cross section
Reception Area