Floor Plans

Floor plan 2 - 7

FLOOR

SQ FT

SQ M

 

Floors 9 - 15

5,543

515

up arrow

Floor 8

5,540

514

up arrow

Floors 1 - 7

17,868

1,659.5

up arrow

Ground Floor

-

-

up arrow

Basement

-

-

up arrow

view out of the window of the EXO building

Sample Fitout

Fitout floor 1 - 7

Sample Fitouts

Density (per. person)

Workstations

Floors 9 - 15 (Professional)

10.72 sq.m

48

up arrow

Floors 1 - 3 (Professional)

9.12 sq.m

182

up arrow

Accommodation Schedule

FLOORS

SQ M

SQ FT

Reception Core 1 (North)

163.58

1,761

Reception Core 3 (South) - Reserved

147.16

1,584

1

1,655.16

17,816

2

1,661.76

17,887

3

1,663.24

17,903

4

An Post

An Post

5

An Post

An Post

6

An Post

An Post

7

An Post

An Post

8

An Post

An Post

9

An Post

An Post

10

518.03

5,576

11

518.03

5,575

12

518.03

5,576

13

518.03

5,575

14

517.66

5,572

15

516.26

5,557

TOTAL AVAILABLE AREA 8,603.66 92,609
ROOF TERRACE LEVEL 08 - Reserved 1,048 11,281

Specification

Image of a Building EXO Building Elevators

Summary

Sustainability

  • LEED Platinum
  • Building Energy rating BER A3
  • NZEB (Near Zero Energy Buildings) office building
  • WIRED Certified Platinum
  • Secure basement bicycle parking and shower facilities
  • Energy efficient lighting with occupancy control
  • Detailed energy modelling validating energy in-use and savings
  • Energy efficient infrastructure to serve tenant space
  • Water saving appliances

Transportation Services

Passenger Lifts

  • 2 no 13 person lifts Core1 Levels 0 – 7
  • 3 no 13 person lifts Core1 Levels 0 – 15
  • 3 no 13 person passenger lifts Core 3

Goods Lift

  • 1 no standard goods lift Core 2

Fire Fighting Lifts

  • Provision: Core 1 and 3 firefighting shafts

Mechanical & Public Health Services Installation

  • Centralised fresh air plant located at basement and roof level providing fresh and tempered air to 4-pipe fan coils (heating and cooling) on each open plan floor.
  • Fresh air provided at a rate of 12.0 (dm³/s) per person based on an occupancy density of 1 person per 8.0 (m2).
  • Centralised mechanical extract to sanitary accommodation with make-up air form adjoining office floor plate.
  • Dedicated supply and extract ventilation plant to basement showering facilities.
  • Main entrance lobbies mechanically cooled (fan coils) and heated (underfloor heating).
  • Sprinkler protection throughout with internal rising and falling firefighting mains (wet).
  • Smoke clearance systems to firefighting shafts, basement plant areas and car parking.
EXO Building cross section

Reception Area